question
Impalement
answer
Failure to protect employees from _____ hazards is one of the top four most frequently cited concrete and masonry violations
question
True
answer
Subpart Q regulations apply to workplaces covered under Part 1926 with hazards associated with concrete and masonry construction
question
Failure to brace unsupported sections of masonry wall over 2' in height
answer
Which of the following is not one of the most frequently cited serious violations of the concrete and masonry construction standards?
question
Limited access zone
answer
An area alongside a masonry wall that is under construction and clearly demarcated to limit access by employees is called a
question
must not
answer
An employer ______ place a construction load on a concrete structure unless the employer determines that the structure is capable of supporting the loads
question
Buckets should be routed away from employees : Concrete buckets Employees must provide barriers to limit access to tensioning operations : Post-tensioning operations Employers must restrict work under concrete buckets while they are being elevated or lowered : Work under loads Protruding reinforced steel must be guarded : Reinforced steel
answer
Match the following definitions to their related terms
question
False
answer
Not all protruding reinforced steel must be guarded
question
True
answer
Signs and barriers must be erected to limit employee access to the post-tensioning area during tensioning operations
question
employer, qualified
answer
Construction loads must not be placed on a concrete structure unless the ______ determines, based on information received from a person who is _____ in structural design, that the structure is capable of supporting the loads
question
False
answer
Employees are permitted to apply a cement, sand, and water mixture through a pneumatic hose without wearing protective head and face equipment
question
True
answer
Bulk storage bins, containers, and silos must be equipped with conical or tapered bottoms, and mechanical or pneumatic means of starting the flow of material
question
Compressed air hoses
answer
______ used on concrete pumping systems must include positive fail-safe joint connectors to prevent the separation of sections when pressurized
question
Handles on these must not extend beyond the wheels on either side of the buggy : Concrete buggies Must be equipped with control switch to automatically shut off power when hands are removed from handles : Power concrete trowels When equipped with hydraulic or pneumatic gates, these must have postitive safety latches to prevent accidental dumping : Concrete buckets Discharged pipes on these must be provided with pipe supports designed for 100% : Concrete pumping systems
answer
Match each of the following to the correct type of concrete equipment
question
True
answer
All equipment must be locked and tagged out at starting points before maintenance or repair can be performed
question
Both A and B
answer
Concrete mixers with one cubic yard or larger loading skips must be equipped with which of the following?
question
False
answer
Sections of tremies and similar concrete conveyances must be secured with twine in addition to the regular couplings or connections
question
All of the above
answer
Which of the following does OSHA require of formwork so that it is capable of supporting all vertical and lateral loads applied to the formwork without failure
question
False
answer
While it is a good practice, vertical slip forms do not have to be designed to prevent excessive distortion of the structure during the jacking operation
question
Formwork
answer
Which of the following is the total system of support for freshly placed or partially cured concrete, including the mold or sheeting (form) that is in contact with the concrete, as well as all supporting members, including shores, reshores, hardward, braces, and related hardware?
question
True
answer
Drawings and plans, including all revisions for the jack layout, formwork, working decks, and scaffolds, must be available at the jobsite.
question
All of the above
answer
If single-post shores are used one on top of another, when which of the following additional shoring requirements must be met?
question
All of the above
answer
Which of the following does OSHA require adequate support for?
question
Must be capable of supporting at least five times the maximum intended load transmitted to the lifting : Lifting hardware Must prohibit employees from being permitted under precast concrete members being lifted or tilted into position : Employers Must be capable of supporting at least two times the maximum intended load applied or transmitted to them : Lifting inserts Must be capable of supporting at least four times the maximum load appled to transmitted to them : Embedded inserts
answer
Match the following standards to the correct terms
question
2
answer
Lifting inserts that are embedded or otherwise attached to tilt-up precast concrete members must be capable of supporting at least _____ times the maximum intended load applied or transmitted to them
question
5
answer
Lifting hardware must be capable of supporting at least ____ times the maximum intended load applied transmitted to the lifting hardware
question
True
answer
No employee must be permitted under precast concrete members being lifted or tilted into position except those employees required for the erection of those members.
question
Registered professional engineer
answer
Lift-slab operations must be designed and planned by a _____ who has experience in lift-slab construction
question
1/2
answer
During lifting, all points at which the slab is supported must be kept within ____ inch of that needed to maintain the slab in a level position
question
Manufacturer
answer
Jack/lifting units must be marked to indicate their rated capacity as established by the _____
question
Limited Access Zone
answer
Whenever a masonry wall is being constructued, employers must establish a _____ prior to the start of construction
question
8
answer
Masonry walls must be braced when they are taller than _____ feet
question
True
answer
Whenever a masonry wall is being constructed, employers must establish a limited access zone prior to the start of construction
question
All of the above
answer
Which of the following are practices that will help prevent struck by hazards
question
True
answer
When employees are working at any height above an exposed rebar, fall protection/prevention is the first line of defense against impalement
question
False
answer
Older machiney does not need to be retrofitted with guarding devices
question
True
answer
The most deadly hazard associated with masonry walls in construction is the collapse of the walls and/or panels
question
True
answer
Sicilica exposure in the form of dust particles is only harmful if the worker is exposed to it for long periods of time
question
True
answer
Employers must not placed construction loads on concrete structures or portions of concrete structures unless a qualified person detemines that the structure or portion of the structure is capable of supporting the loads
question
Employer
answer
Which of the following determines when formwork can be removed from cast-in-place concrete?
question
4
answer
Lifting inserts which are embedded or otherwise attached to precast concrete members, other than the tilt-up members, shall be capable of supporting at least ______ times the maximum intended load applied or transmieed to them
question
True
answer
Concrete mixers with greater than 1 cubic yard capacity must have guardrails on each side of the skip.
question
Head and face equipment
answer
According to Subpart Q, which of the following personal protective equipment is required when an employee applies a cement/sand/water mixture through a hose?
question
True
answer
A masonry saw must be guarded with a semicircular enclosure over the blade
question
All of the above
answer
The limited access zone of a masonry wall must be which of the following?
question
True
answer
Support for precast concrete can be removed when permanent connections are completed
question
True
answer
Silicia exposure in the form of dust particles is only harmful if the worker is exposed to it for long periods of time
question
Behind
answer
Employees should not be _____ the jack during tensioning operations