MIS Chapter 9

7 September 2022
4.7 (114 reviews)
124 test answers

Unlock all answers in this set

Unlock answers (120)
question
Which phase does the firm analyzes its end-user business requirements and refines project goals into defined functions and operations of the intended system? A. Analysis phase B. Design phase C. Development phase D. Testing phase
answer
Analysis phase
question
What are the specific business requests the system must meet to be successful, so the analysis phase is critical because business requirements drive the entire systems development effort? A. COBIT B. Conversion C. Business requirements D. Sign-off
answer
Business requirements
question
What is the process of transferring information from a legacy system to a new system? A. COBIT B. Conversion C. Business requirements D. Sign-off
answer
Conversion
question
What modifies software to meet specific user or business requirements? A. Software customization B. Conversion C. Business requirements D. Sign-off
answer
Software customization
question
Which software supports general business processes and does not require any specific software customization to meet the organization's needs? A. SDLC B. Software customization C. Off-the-shelf application D. Application software
answer
Off-the-shelf application
question
What is the overall process for developing information systems, from planning and analysis through implementation and maintenance? A. SDLC B. Software customization C. Off-the-shelf application D. Sign-off
answer
SDLC
question
Which phase establishes a high-level plan of the intended project and determines project goals? A. Testing phase B. Analysis phase C. Maintenance phase D. Planning phase
answer
Planning phase
question
What is a person or event that is the catalyst for implementing major changes for a system to meet business changes? A. Change controller B. Change over C. Change management D. Change agent
answer
Change agent
question
What is a technique for generating ideas by encouraging participants to offer as many ideas as possible in a short period without any analysis until all the ideas have been exhausted? A. Brainstorming B. Change agent C. Test conditions D. Bugs
answer
Brainstorming
question
What is the process of managing changes to the business requirements throughout the project? A. Requirements documentation B. Requirements management C. Requirements definition document D. All of the above
answer
Requirements documentation
question
Which document prioritizes all of the business requirements by order of importance to the company? A. Requirements documentation B. Requirements management C. Requirements definition document D. All of the above
answer
Requirements definition document
question
What contains the users' actual signatures indicating they approve all of the business requirements? A. Requirements documentation B. Requirements management C. Requirements definition document D. Sign-off
answer
Sign-off
question
Which phase takes all the detailed design documents from the design phase and transforms them into the actual system? A. Testing phase B. Analysis phase C. Development phase D. Planning phase
answer
Development phase
question
What is a disciplined approach for constructing information systems through the use of common methods, techniques, or tools? A. Software B. Software testing C. Software engineering D. Software managing
answer
Software engineering
question
What do software engineers use as tools to provide automated support for the development of the system? A. Software B. IEEE C. COBIT D. CASE
answer
CASE
question
What is a set of best practices that helps an organization to maximize the benefits of an information system, while at the same time establishing appropriate controls to ensure minimum errors? A. COBIT B. CASE C. IEEE D. All of the above
answer
COBIT
question
What is a programming method that provides for interactive modules to a website? A. Scripting language B. Object-oriented language C. Fourth-generation language D. All of the above
answer
Scripting language
question
What language groups data and corresponding processes into objects? A. Scripting language B. Object-oriented language C. Fourth-generation language D. All of the above
answer
Object-oriented language
question
What languages are programming languages that look similar to human languages? A. Scripting language B. Object-oriented language C. Fourth-generation language D. All of the above
answer
Fourth-generation language
question
Which phase brings all the project pieces together into a special testing environment to eliminate errors and bugs, and verify that the system meets all the business requirements defined in the analysis phase? A. Testing phase B. Analysis phase C. Development phase D. Planning phase
answer
Testing phase
question
What are defects in the code of an information system? A. Testing B. Bugs C. Insects D. All of the above
answer
Bugs
question
What detail the steps the system must perform along with the expected result of each step in the implementation phase the organization places the system into production so users can begin to perform actual business operations with it? A. Testing phase B. Testing documentation C. Test conditions D. All of the above
answer
Test conditions
question
What is created that highlights how to use the system and how to troubleshoot issues or problems? A. Detailed user documentation B. Requirements definition document C. Scope document D. All of the above
answer
Detailed user documentation
question
What is also provided for the system users and can be online or in a classroom? A. Training B. Testing C. Implementation phase D. Testing phase
answer
Training
question
What runs over the Internet or on a CD or DVD, and employees complete the training on their own time at their own pace? A. Online training B. Workshop training C. Help desk D. Corrective maintenance
answer
Online training
question
What is held in a classroom environment and led by an instructor? A. Online training B. Workshop training C. Help desk D. Corrective maintenance
answer
Workshop training
question
What is a group of people who respond to users questions? A. Online training B. Workshop training C. Help desk D. Corrective maintenance
answer
Help desk
question
What assess if the entire system meets the design requirements of the users? A. Alpha testing B. Development testing C. Integration testing D. System testing
answer
Alpha testing
question
What occurs when programmers test the system to ensure it is bug-free? A. Alpha testing B. Development testing C. Integration testing D. System testing
answer
Development testing
question
What verifies that separate systems can work together passing data back and forth correctly? A. Alpha testing B. Development testing C. Integration testing D. System testing
answer
Integration testing
question
What verifies that the units or pieces of code function correctly when integrated together? A. Alpha testing B. Development testing C. Integration testing D. System testing
answer
System testing
question
What determines if the system satisfies the user and business requirements? A. Alpha testing B. Development testing C. Integration testing D. User acceptance testing
answer
User acceptance testing
question
What tests individual units or pieces of code for a system? A. Unit testing B. Development testing C. Integration testing D. User acceptance testing
answer
Unit testing
question
Which implementation uses both the legacy system and new system until all users verifies that the new system functions correctly? A. Parallel implementation B. Plunge implementation C. Pilot implementation D. Phased implementation
answer
Parallel implementation
question
Which implementation discards the legacy system completely and immediately migrates all users to the new system? A. Parallel implementation B. Plunge implementation C. Pilot implementation D. Phased implementation
answer
Plunge implementation
question
Which implementation is a small group of people use the new system until it is verified that it works correctly then the remaining users migrate? A. Parallel implementation B. Plunge implementation C. Pilot implementation D. Phased implementation
answer
Pilot implementation
question
Which implementation installs the new system in phases (for example by department) until it is verified that it works correctly? A. Parallel implementation B. Plunge implementation C. Pilot implementation D. Phased implementation
answer
Phased implementation
question
What makes system changes to repair design flaws, coding errors, or implementation issues? A. Corrective maintenance B. Preventative maintenance C. Pilot implementation D. Phased implementation
answer
Corrective maintenance
question
What makes system changes to reduce the chance of future system failure? A. Corrective maintenance B. Preventative maintenance C. Pilot implementation D. Phased implementation
answer
Preventative maintenance
question
Which reports present data that is distributed inside the organization and is intended for employees within an organization? A. Internal reports B. Detailed internal reports C. Summary internal reports D. Exception reports
answer
Internal reports
question
Which internal reports present information with little or no filtering or restrictions of the data? A. Internal reports B. Detailed internal reports C. Summary internal reports D. Exception reports
answer
Detailed internal reports
question
Which internal reports organize and categorize data for managerial perusal? A. Internal reports B. Detailed internal reports C. Summary internal reports D. Exception reports
answer
Summary internal reports
question
Which reports provide an internal report that highlights situations occurring outside of the normal operating range for a condition or standard? A. Internal reports B. Detailed internal reports C. Summary internal reports D. Exception reports
answer
Exception reports
question
Which of the following is a business-related consequence of successful software? A. Increased revenues B. Damage to brand reputation C. Increased liabilities D. Increased expenses
answer
Increased revenues
question
Which of the following is a business-related consequence of failing software? A. Decreased productivity B. Damage to brand reputation C. Increased liabilities D. All of the above
answer
All of the above
question
What is the systems development life cycle? A. Involves establishing a high-level plan of the intended project and determining project goals B. Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system C. Involves describing the desired features and operations of the system D. The overall process for developing information systems from planning and analysis through implementation and maintenance
answer
The overall process for developing information systems from planning and analysis through implementation and maintenance
question
What is the overall process for developing information systems from planning and analysis through implementation and maintenance? A. Systems development life cycle B. Project management C. Systems management D. Project development life cycle
answer
Systems development life cycle
question
Which of the following represents the phases in the SDLC? A. Plan, analysis, design, test, maintain, develop, implement B. Analysis, plan, design, test, develop, maintain, implement C. Plan, analysis, design, develop, test, implement, maintain D. Analysis, plan, develop, design, test, implement, maintain
answer
Plan, analysis, design, develop, test, implement, maintain
question
What is the analysis phase in the SDLC? A. Involves establishing a high-level plan of the intended project and determining project goals B. Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system C. Involves describing the desired features and operations of the system D. Involves placing the system into production so users can begin to perform actual business operations with the system
answer
Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system
question
Which phase of the SDLC gathers business requirements? A. Plan B. Analysis C. Test D. Design
answer
Analysis
question
What is a business requirement? A. The nonspecific business requests the system must meet to be successful B. The specific business requests the system must meet to be successful C. The nonspecific methodology the system must meet to be successful D. The specific methodology the system must meet to be successful
answer
The specific business requests the system must meet to be successful
question
What is the design phase in the SDLC? A. Involves establishing a high-level plan of the intended project and determining project goals B. Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system C. Involves describing the desired features and operations of the system D. Involves placing the system into production so users can begin to perform actual business operations with the system
answer
Involves describing the desired features and operations of the system
question
What is the implementation phase in the SDLC? A. Involves establishing a high-level plan of the intended project and determining project goals B. Involves analyzing end-user business requirements and refining project goals into defined functions and operations of the intended system C. Involves describing the desired features and operations of the system D. Involves placing the system into production so users can begin to perform actual business operations with the system
answer
Involves placing the system into production so users can begin to perform actual business operations with the system
question
What is a set of policies, procedures, standards, processes, practices, tools, techniques, and tasks that people apply to technical and management challenges? A. SDLC B. Methodology C. Waterfall D. Agile
answer
Methodology
question
Which of the following is an issue related to the waterfall methodology? A. Flaws in accurately defining and articulating the business problem B. Managing costs, resources, and time constraints C. Assumes users can specify all business requirements in advance D. All of the above
answer
All of the above
question
What consists of a series of tiny projects? A. Waterfall methodology B. Iterative development C. Agile methodology D. All of the above
answer
Iterative development
question
Which methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirements? A. RAD methodology B. Agile methodology C. Waterfall methodology D. Extreme programming
answer
Agile methodology
question
Which of the following describes agile? A. Fast and efficient B. Small and nimble C. Lower cost D. All of the above
answer
All of the above
question
Which of the following is not a primary form of agile methodology? A. RAD B. SDLC C. RUP D. SCRUM
answer
SDLC
question
What is an activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance? A. RAD methodology B. Agile methodology C. Waterfall methodology D. Extreme programming
answer
Waterfall methodology
question
What emphasizes extensive user involvement in the rapid and evolutionary construction of working prototypes of a system to accelerate the systems development process? A. RAD methodology B. Agile methodology C. Waterfall methodology D. Extreme programming
answer
RAD methodology
question
What breaks a project into tiny phases, and developers cannot continue on to the next phase until the first phase is complete? A. RAD methodology B. Agile methodology C. Waterfall methodology D. Extreme programming
answer
Extreme programming
question
What is the success rate for a project using the waterfall methodology? A. 1 in 10 B. 2 in 10 C. 4 in 10 D. 8 in 10
answer
1 in 10
question
Which of the following is a fundamental of the RAD methodology? A. Focus initially on creating a prototype that looks and acts like the desired system B. Actively involve system users in the analysis, design, and development phases C. Accelerate collecting the business requirements through an interactive and iterative construction approach D. All of the above
answer
All of the above
question
Which methodology provides a framework for breaking down the development of software into four gates? A. SCRUM B. XP C. RAD D. RUP
answer
RUP
question
Which of the following is not one of the four gates in the RUP methodology? A. Inception B. Collaboration C. Construction D. Transition
answer
Collaboration
question
Which gate in the RUP methodology expands on the agreed-upon details of the system, including the ability to provide an architecture to support and build it? A. Inception B. Elaboration C. Construction D. Transition
answer
Elaboration
question
Which gate in the RUP methodology includes building and developing the project? A. Inception B. Elaboration C. Construction D. Transition
answer
Construction
question
Which methodology is owned by IBM? A. SCRUM B. XP C. RAD D. RUP
answer
RUP
question
Which methodology uses small teams to produce small pieces of deliverable software using sprints, or 30-day intervals, to achieve an appointed goal? A. SCRUM B. XP C. RUP D. RAD
answer
SCRUM
question
Which methodology ends each day or begins with a stand-up meeting to monitor and control the development effort? A. Scrum B. XP C. RUP D. RAD
answer
Scrum
question
How many days is a typical sprint in the Scrum methodology? A. 2 days B. 10 days C. 30 days D. 90 days
answer
30 days
question
What are the three primary variables (or triple constraints) in any project? A. Time, cost, expense B. Time, expense, requirements C. Time, cost, scope D. Time, cost, quality
answer
Time, cost, scope
question
What is the number one reason that IT projects fall behind schedule or fail? A. Change in business goals during the project B. Lack of support from business management C. Poor planning or poor project management D. Change in technology during the project
answer
Poor planning or poor project management
question
Which of the following is a characteristic of a successful project? A. Delivered on time B. Delivered within budget C. Meets the business's requirements D. All of the above
answer
All of the above
question
What is a project? A. A temporary activity undertaken to create a unique product, service, or result B. The application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project C. Any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project D. Represent key dates when a certain group of activities must be performed
answer
A temporary activity undertaken to create a unique product, service, or result
question
What are project deliverables? A. A temporary endeavor undertaken to create a unique product or service B. The application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project C. Any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project D. Represent key dates when a certain group of activities must be performed
answer
Any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project
question
What is a project manager? A. The application of knowledge, skills, tools, and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project B. Any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project C. Represent key dates when a certain group of activities must be performed D. An individual who is an expert in project planning and management
answer
An individual who is an expert in project planning and management
question
Which of the following does a project manager perform? A. Defines and develops the project plan B. Tracks the plan to ensure all key project milestones are completed on time C. Expert in project planning and management D. All of the above
answer
All of the above
question
What is an internal department that oversees all organizational projects? A. Project deliverables B. Project Scope C. Project management office D. Project milestones
answer
Project management office
question
The PMI develops procedures and concepts necessary to support the profession of project management. Which of the following is not one of the three areas it focuses on? A. The distinguishing characteristics of a practicing professional (ethics) B. The content and structure of the profession's body of knowledge (standards) C. Change in business goals during project planning (management) D. Recognition of professional attainment (accreditation)
answer
Change in business goals during project planning (management)
question
Who are individuals and organizations actively involved in the project or whose interests might be affected as a result of project execution or project completion? A. Project manager B. Project stakeholders C. Executive sponsor D. All of the above
answer
Project stakeholders
question
Who is the person or group who provides the financial resources for the project? A. Project manager B. Project stakeholders C. Executive sponsor D. All of the above
answer
Executive sponsor
question
What defines the how, what, when, and who regarding the flow of project information to stakeholders and is key for managing expectations? A. Communication plan B. Executive sponsor C. Project assumptions D. Project deliverable
answer
Communication plan
question
Who is the person or group who provides the financial resources for the project? A. Project manager B. Executive sponsor C. Project assumptions D. Project deliverable
answer
Executive sponsor
question
What are factors considered to be true, real, or certain without proof or demonstration? A. Project plan B. Project constraints C. Project assumptions D. Project deliverable
answer
Project assumptions
question
What are specific factors that can limit options including budget, delivery dates, available skilled resources, and organizational policies? A. Project objectives B. Project constraints C. Project assumptions D. Project deliverable
answer
Project constraints
question
What is any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project? A. Project milestones B. Project objectives C. Project assumptions D. Project deliverable
answer
Project deliverable
question
What represents key dates when a certain group of activities must be performed? A. Project milestones B. Project objectives C. Project assumptions D. Project deliverable
answer
Project milestones
question
What are quantifiable criteria that must be met for the project to be considered a success? A. Project milestones B. Project objectives C. Project assumptions D. Project deliverable
answer
Project objectives
question
What defines the specifications for product/output of the project and is key for managing expectations, controlling scope, and completing other planning efforts? A. Project milestones B. Project objectives C. Project requirements document D. Project deliverable
answer
Project requirements document
question
What statement links the project to the organization's overall business goals. It describes the business need (the problem the project will solve) and the justification, requirements, and current boundaries for the project? A. Project milestones B. Project objectives C. Project scope D. Project deliverable
answer
Project scope
question
Who are individuals and organizations actively involved in the project or whose interests might be affected as a result of project execution or project completion? A. Project stakeholders B. Project managers C. Project planners D. Project testers
answer
Project stakeholders
question
What defines all project roles and indicates what responsibilities are associated with each role? A. Communication plan B. Responsibility matrix C. Project assumptions D. Project deliverable
answer
Responsibility matrix
question
What are project constraints? A. Specific factors that can limit options B. Factors that are considered to be true, real, or certain without proof or demonstration C. Quantifiable criteria that must be met for the project to be considered a success D. A document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities
answer
Specific factors that can limit options
question
What are project assumptions? A. Specific factors that can limit options B. Factors that are considered to be true, real, or certain without proof or demonstration C. Quantifiable criteria that must be met for the project to be considered a success D. A document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities
answer
Factors that are considered to be true, real, or certain without proof or demonstration
question
What is a project charter? A. Specific factors that can limit options B. Factors that are considered to be true, real, or certain without proof or demonstration C. Quantifiable criteria that must be met for the project to be considered a success D. A document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities
answer
A document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities
question
An organization must identify what it wants to do and how it is going to do it. What does the "what" part of this question focus on? A. Justification of the project B. Definition of the project C. Expected results of the project D. All of the above
answer
All of the above
question
An organization must identify what it wants to do and how it is going to do it. What does the "how" part of this question focus on? A. Justification of the project B. Definition of the project C. Analysis of project risks D. Expected results of the project
answer
Analysis of project risks
question
Which of the following is not a technique for choosing strategic projects? A. Categorize projects B. Perform a financial analysis C. Focus on organizational goals D. Develop a project plan
answer
Develop a project plan
question
What is project scope? A. Quantifiable criteria that must be met for the project to be considered a success B. Products, services, or processes that are not specifically a part of the project C. Any measurable, tangible, verifiable outcome, result or item that is produced to complete a project or part of a project D. Defines the work that must be completed to deliver a product with the specified features and functions
answer
Defines the work that must be completed to deliver a product with the specified features and functions
question
What are project objectives? A. Quantifiable criteria that must be met for the project to be considered a success B. Products, services, or processes that are not specifically a part of the project C. Any measurable, tangible, verifiable outcome, result or item that is produced to complete a project or part of a project D. Defines the work that must be completed to deliver a product with the specified features and functions
answer
Quantifiable criteria that must be met for the project to be considered a success
question
What do SMART criteria for successful objective creation include? A. Specific, metrics, agreed upon, real, time valued B. Specific, measurable, agreed upon, realistic, time framed C. Specific, measurable, accurate, real, time valued D. Specific, metrics, agreed upon, realistic, time framed
answer
Specific, measurable, agreed upon, realistic, time framed
question
Which of the following is not a characteristic of a well-defined project plan? A. Prepared by the project manager B. Easy to read C. Appropriate to the project's size D. Communicated to all key participants
answer
Prepared by the project manager
question
What is the most important part of the project plan? A. Gantt chart B. Specification C. Communication D. None of the above
answer
Communication
question
What is a graphical network model that depicts a project's tasks and the relationships between those tasks? A. Gantt chart B. PERT chart C. Dependency D. All of the above
answer
PERT chart
question
What is the logical relationship that exists between the project tasks, or between a project task and a milestone? A. Resource B. Task C. Dependency D. Activity
answer
Dependency
question
What is a simple bar chart that depicts project tasks against a calendar? A. Gantt chart B. PERT chart C. Dependency D. All of the above
answer
Gantt chart
question
What type of chart typically displays the critical path? A. Gantt chart B. PERT chart C. All of the above D. None of the above
answer
PERT chart
question
What is the critical path? A. The path from resource to task that passes through all critical components of a project plan B. The path between tasks to the projects finish that passes through all critical components of a project plan C. The path from start to finish that passes through all the tasks that are critical to completing the project in the shortest amount of time D. The path from start to finish that passes through all the tasks that are critical to completing the project in the longest amount of time
answer
The path from start to finish that passes through all the tasks that are critical to completing the project in the shortest amount of time
question
In a Gantt chart tasks are listed __________ and the project's time frame is listed ____________. A. Vertically, horizontally B. Horizontally, vertically C. Vertically, Vertically D. Horizontally, horizontally
answer
Vertically, horizontally
question
Which of the following includes a common reason why change occurs? A. A misunderstanding of the initial scope B. Shifts in planned technology that force unexpected and significant changes to the business C. An omission in defining initial scope D. All of the above
answer
All of the above
question
Which of the following is not a guideline for effectively dealing with change management? A. Institute change management policies B. Seek change C. Anticipate change D. Stop change
answer
Stop change
question
What is the outsourcing option that includes the most remote location and indirect customer control? A. Onshore outsourcing B. Nearshore outsourcing C. Offshore outsourcing D. None of the above
answer
Offshore outsourcing
question
What is the outsourcing option that includes the closest location and direct customer control? A. Onshore outsourcing B. Nearshore outsourcing C. Offshore outsourcing D. None of the above
answer
Onshore outsourcing
question
All of the following are challenges of outsourcing, except: A. Contract length B. Competitive edge C. Confidentiality D. Reduced frustration and expense related to hiring and retaining employees in an exceptionally tight job market
answer
Reduced frustration and expense related to hiring and retaining employees in an exceptionally tight job market
question
Which of the following is an outsourcing challenge caused by contract length? A. Difficulties in getting out of a contract B. Problems in foreseeing future issues C. Problems in reforming an internal IT department D. All of the above
answer
All of the above
question
What is a common approach using the professional expertise within an organization to develop and maintain the organization's information technology systems? A. In-sourcing B. Outsourcing C. Business process outsourcing D. Offshore outsourcing
answer
In-sourcing
question
What is an arrangement by which one organization provides a service or services for another organization that chooses not to perform them in-house? A. In-sourcing B. Outsourcing C. Business process outsourcing D. Offshore outsourcing
answer
Outsourcing
question
What is it called when a company uses organizations from developing countries to write code and develop systems? A. In-sourcing B. Outsourcing C. Business process outsourcing D. Offshore outsourcing
answer
Offshore outsourcing
question
Which of the following is a benefit an organization can receive from outsourcing? A. Financial savings B. Increase technical abilities C. Market agility D. All of the above
answer
All of the above
question
Which of the following is the primary reason why companies outsource? A. Tap outside sources of expertise B. Concentrate resources on core business C. Reduce headcount and related expenses D. Better manage the costs of internal processes
answer
Tap outside sources of expertise
question
Which of the following is the least common reason why companies outsource? A. Tap outside sources of expertise B. Concentrate resources on core business C. Reduce headcount and related expenses D. Better manage the costs of internal processes
answer
Better manage the costs of internal processes
question
What is the application of knowledge, skills, tools, and techniques to project activities to meet project requirements? A. Project management B. Project management software C. Scope D. None of the above
answer
Project management