Supply Chain Exam 2 (Chapter 16)

24 July 2022
4.7 (114 reviews)
79 test answers

Unlock all answers in this set

Unlock answers (75)
question
1) TPS stands for Toyota Production System.
answer
Answer: TRUE
question
2) TPS stands for Total Production Streamlining.
answer
Answer: FALSE
question
3) Product storage is an example of waste in the sense that no value is added.
answer
Answer: TRUE
question
4) In a JIT system, product inspection adds value by identifying defective items.
answer
Answer: FALSE
question
5) Customer demand will always remain an unknown, so it is not considered a source of variability.
answer
Answer: FALSE
question
6) Variability in manufacturing can occur because engineering drawings or specifications are incomplete or inaccurate.
answer
Answer: TRUE
question
7) A push system means providing the next station with exactly what is needed when it is needed.
answer
Answer: FALSE
question
8) Waste is anything that does not add value from the consumer's perspective.
answer
Answer: TRUE
question
9) Increasing inventory exposes variability in production processes.
answer
Answer: FALSE
question
10) The 5Ss—sort/segregate, simplify/straighten, shine/sweep, standardize, and sustain/self discipline—are important to lean production because they act as a means to reduce waste.
answer
Answer: TRUE
question
11) When implemented as a comprehensive operations strategy, JIT, TPS, and lean systems sustain competitive advantage and result in increased overall returns.
answer
Answer: TRUE
question
12) What does TPS stand for? A) Total Production Streamlining B) Toyota Production System C) Taguchi's Production S's D) Total Process Simplification E) Transparent Processing System
answer
Answer: B) Toyota Production System
question
13) Which of the following is generally found in most lean environments? A) a push or pull system, depending upon the rate of demand B) a push system for high margin items and a pull system for low margin items C) a push system for purchased parts and a pull system for manufactured parts D) push systems E) pull systems
answer
Answer: E) pull systems
question
14) Which of the following is NOT a source of variability? A) Employees, machines, and suppliers produce units late. B) Customer demand is unknown. C) Employees, machines, and suppliers produce units that conform to standards. D) Engineering drawings are inaccurate. E) Drawings or specifications are incomplete.
answer
Answer: C) Employees, machines, and suppliers produce units that conform to standards.
question
15) Which of the following is specifically characterized by a focus on continuous improvement, respect for people, and standard work practices? A) Just-in-time (JIT) B) Toyota Production System (TPS) C) Lean operations D) Material requirements planning (MRP) E) kanban
answer
Answer: B) Toyota Production System (TPS)
question
16) Which of the following is specifically characterized by continuous and forced problem solving via a focus on throughput and reduced inventory? A) Just-in-time (JIT) B) Toyota Production System (TPS) C) Lean operations D) Material requirements planning (MRP) E) kanban
answer
Answer: A) Just-in-time (JIT)
question
17) Which of the following statements regarding a pull system is TRUE? A) Large lots are pulled from upstream stations. B) Work is pulled to the downstream stations before it is actually needed. C) Manufacturing cycle time is increased. D) Problems become more obvious. E) None of the above is true of a pull system.
answer
Answer: D) Problems become more obvious.
question
18) Manufacturing cycle time is best defined as the: A) length of the work shift, expressed in minutes per day. B) time it takes a unit to move from one workstation to the next. C) time between the start of one unit and the start of the next unit. D) sum of all the task times to make one unit of a product. E) time from raw materials receipt to finished product exit.
answer
Answer: E) time from raw materials receipt to finished product exit.
question
19) Which of the following is specifically characterized by the elimination of waste through a focus on exactly what the customer wants? A) Just-in-time (JIT) B) Toyota Production System (TPS) C) Lean operations D) Material requirements planning (MRP) E) kanban
answer
Answer: C) Lean operations
question
20) Which of the following is NOT one of the Seven Wastes? A) overproduction B) transportation C) assignment D) defective product E) motion
answer
Answer: C) assignment
question
21) The 5Ss: A) have the "flavor" of a housekeeping list. B) are a checklist for lean operations. C) have become a list of seven items in American practice. D) can be used to assist with necessary changes in organizational culture. E) All of these are true.
answer
Answer: E) All of these are true.
question
22) The list of 5Ss, although it looks like a housekeeping directive, supports lean production by: A) identifying non-value items and removing them, in the "sort/segregate" category. B) reducing inventory, in the "standardize" category. C) increasing variability through standardized procedures, in the "standardize" category. D) eliminating wasted motion through ergonomic studies, in the "support" category. E) building good safety practices, in the "shine/sweep" category.
answer
Answer: A) identifying non-value items and removing them, in the "sort/segregate" category.
question
1) JIT brings about competitive advantage by faster response to the customer regardless of cost.
answer
Answer: FALSE
question
2) One goal of JIT partnerships is the removal of in-plant inventory by delivery in small lots directly to the using department as needed.
answer
Answer: TRUE
question
3) Many suppliers feel that having a variety of customers is better than being tied to long-term contracts with one customer.
answer
Answer: TRUE
question
4) JIT suppliers have concerns that the JIT firm's demands for small lot sizes are simply a way of transferring holding cost from the JIT firm to the suppliers.
answer
Answer: TRUE
question
5) A common JIT layout tactic is to minimize distance.
answer
Answer: TRUE
question
6) Cross-training is a common JIT layout tactic to improve flexibility.
answer
Answer: TRUE
question
7) JIT systems carry inventory just in case something goes wrong.
answer
Answer: FALSE
question
8) Hidden problems are generally uncovered during the process of reducing inventory.
answer
Answer: TRUE
question
9) A scheduler may find that freezing the portion of the schedule closest to the due dates allows the production system to function and the schedule to be met.
answer
Answer: TRUE
question
10) The first step in reducing setup times is the separation of setup into preparation activities and actual setup, so that as much work as possible can be done while the machine or process is operating.
answer
Answer: TRUE
question
11) Level scheduling means producing at a constant rate, regardless of customer demands.
answer
Answer: FALSE
question
12) With level schedules, a few large batches, rather than frequent small batches, are processed.
answer
Answer: FALSE
question
13) The number of kanbans decreases as safety stock is increased.
answer
Answer: FALSE
question
14) A kanban system requires that the process has little variability in lead time because shortages impact the entire production system.
answer
Answer: TRUE
question
15) The quality management tool called poka-yoke is not relevant to JIT systems.
answer
Answer: FALSE
question
16) Concerning relationships with suppliers, which of the following combinations is critical to the success of JIT? A) close relationships with trust B) close relationships with skepticism C) distant relationships with trust D) distant relationships with skepticism E) none of the above
answer
Answer: A) close relationships with trust
question
17) Which one of the following is not a benefit of JIT implementation? A) cost reduction B) variability increase C) rapid throughput D) quality improvement E) rework reduction
answer
Answer: B) variability increase
question
18) If the goals of JIT partnerships are met, which of the following is a result? A) For incoming goods, receiving activity and inspection are outsourced. B) In-transit inventory falls as suppliers are located closer to facilities. C) Suppliers maintain a variety of customers to reduce risk. D) In-plant inventory replaces in-transit inventory. E) All of the above are consequences of meeting the JIT partnership goals.
answer
Answer: B) In-transit inventory falls as suppliers are located closer to facilities.
question
19) Which one of the following is a characteristic of a JIT partnership? A) third-party logistics never used B) maximal product specifications imposed on supplier C) active pursuit of vertical integration D) removal of incoming inspection E) frequent deliveries in large lot quantities
answer
Answer: D) removal of incoming inspection
question
20) Characteristics of just-in-time partnerships do NOT include: A) removal of in-transit inventory. B) large lot sizes to save on setup costs and to gain quantity discounts. C) long-term contracts. D) produce with zero defects. E) focus on core competencies.
answer
Answer: B) large lot sizes to save on setup costs and to gain quantity discounts.
question
21) Which of the following is not a goal of JIT partnerships? A) removal of unnecessary activities B) removal of in-plant inventory C) removal of in-transit inventory D) inspect all incoming shipments to ensure zero defects E) All of the above are goals of JIT partnerships.
answer
Answer: D) inspect all incoming shipments to ensure zero defects
question
22) Which of the following is NOT a goal of JIT partnerships? A) removal of unnecessary activities B) removal of in-plant inventory C) removal of in-transit inventory D) obtain improved quality and reliability E) All of the above are goals of JIT partnerships.
answer
Answer: E) All of the above are goals of JIT partnerships.
question
23) Which one of the following is a concern expressed by suppliers in JIT partnerships? A) having too many customers B) delivery to the point of use C) having limited ability to respond to changes in product and quality D) large lot sizes E) customers' infrequent engineering changes
answer
Answer: C) having limited ability to respond to changes in product and quality
question
24) How can a reduction of in-transit inventory be encouraged? A) supplier location near plants B) high setup costs C) low carrying costs D) use of trains, not trucks E) low-cost, global suppliers
answer
Answer: A) supplier location near plants
question
25) In JIT partnerships, suppliers have several concerns. Which of the following is NOT such a concern? A) desire for diversification B) poor customer scheduling C) small lot sizes D) producing high enough quality levels E) customers' infrequent engineering changes
answer
Answer: E) customers' infrequent engineering changes
question
26) Which of the following is NOT a concern of suppliers as they prepare to enter into JIT partnerships? A) Suppliers feel that they would be less at risk if they contracted with more than one customer. B) Suppliers are concerned that customers will present frequent engineering changes with inadequate lead time to deal with them. C) Suppliers feel that their processes are suited for larger lot sizes than the customer wants. D) Suppliers are concerned that frequent delivery of small quantities is economically prohibitive. E) All of the above represent JIT supplier concerns.
answer
Answer: E) All of the above represent JIT supplier concerns.
question
27) Just-in-time systems make demands on layouts, including the need for: A) distance reduction. B) increased flexibility. C) reduced space and inventory. D) cross-trained, flexible employees. E) all of the above
answer
Answer: E) all of the above
question
28) Which one of the following is NOT a layout tactic in a JIT environment? A) work cells for families of products B) fixed equipment C) minimizing distance D) little space for inventory E) poka-yoke devices
answer
Answer: B) fixed equipment
question
29) Who is credited with coining the phrase, "Inventory is evil"? A) Poka Yoke B) Pat "Keiretsu" Morita C) Kanban Polka D) Shigeo Shingo E) Taiichi Ohno
answer
Answer: D) Shigeo Shingo
question
30) Which one of the following statements is TRUE regarding JIT inventory? A) It exists just in case something goes wrong. B) It is the minimum inventory necessary to keep a perfect system running. C) It hides variability. D) It is minimized with large lot production. E) It increases if setup costs decrease.
answer
Answer: B) It is the minimum inventory necessary to keep a perfect system running.
question
31) A firm wants to develop a level material use schedule based on the following data. What should be the setup cost? Desired lot size: 60 Annual demand: 40,000 Holding cost: $20 per unit per year Daily production rate: 320 Work days per year: 250 A) $0.45 B) $4.50 C) $45 D) $450 E) $500
answer
Answer: A) $0.45
question
32) A product has annual demand of 100,000 units. The plant manager wants production to follow a four-hour cycle. Based on the following data, what setup cost will enable the desired production cycle? d = 400 per day (250 days per year), p = 4000 units per day, H = $40 per unit per year, and Q = 200 (demand for four hours, half a day). A) $2.00 B) $7.20 C) $18.00 D) $64.00 E) $1,036.80
answer
Answer: B) $7.20
question
33) Which of the following is TRUE regarding the steps to reducing setup times? A) The first step involves performing as much setup preparation as possible while the process/machine is operating. B) The cycle of steps is repeated until setup time is reduced to under a minute. C) The standardization of both tooling and work procedures is advantageous to setup time reduction. D) Move material closer and improve material handling are done before operator training. E) All of the above are true.
answer
Answer: E) All of the above are true.
question
34) If a factory wants to cut its current lot size in half, by what proportion must setup cost change? A) Setup cost must be cut to one fourth its current value. B) Setup cost must also be cut in half from its current value. C) Setup cost must double from its current value. D) Cannot be determined. E) Setup cost must quadruple from its current value.
answer
Answer: A) Setup cost must be cut to one fourth its current value.
question
35) Which one of the following statements is TRUE about the kanban system? A) The quantities in the containers are usually large to reduce setup costs. B) It is associated with a push system. C) It is useful to smooth operations when numerous quality problems occur. D) The supplier workstation signals the customer workstation as soon as a batch is completed. E) The customer workstation signals to the supplier workstation when production is needed.
answer
Answer: E) The customer workstation signals to the supplier workstation when production is needed.
question
36) Kanban is associated with all EXCEPT which of the following? A) small lot sizes B) signals, such as cards, lights, or flags C) moving inventory only as needed D) increased material handling E) reductions in inventory
answer
Answer: D) increased material handling
question
37) What does the Japanese word "kanban" mean? A) low inventory B) employee empowerment C) card D) continuous improvement E) lot size of one
answer
Answer: C) card
question
38) Which one of the following scenarios represents the use of a kanban to reduce inventories? A) A supervisor tells the operators to stay busy and start producing parts for next month. B) A "supplier" work center signals the downstream workstation that a batch has been completed. C) A supervisor signals to several work centers that the production rate should be changed. D) A "customer" work center signals to the "supplier" workstation that more parts are needed. E) An operator asks the next station's operator to help him fix his machine.
answer
Answer: D) A "customer" work center signals to the "supplier" workstation that more parts are needed.
question
39) The number of kanbans should be equal to which of the following? A) one B) the ratio of (demand during lead time + safety stock) to container size C) one-half of the EOQ D) one full day's production divided by the EOQ E) the ratio of demand during lead time to (container size + safety stock)
answer
Answer: B) the ratio of (demand during lead time + safety stock) to container size
question
40) Lead time for cakes is 2 days with daily demand of 10 cakes and a safety stock of ½ a day. Each container (kanban) holds 1 cake. What is the correct number of kanbans? A) 4 B) 1 C) 5 D) 10 E) 25
answer
Answer: E) 25
question
41) The cook in a fast-food restaurant knows that 2 hamburger patties and an order of fries should be started for each car that is waiting in line. This is best an example of: A) keiretsu. B) kanban. C) push production. D) kaizen. E) EOQ.
answer
Answer: B) kanban.
question
42) Lead time for computers is 7 days with daily demand of 5 computers and a safety stock of 1 day. Each kanban holds 8 computers. What is the correct number of kanbans? A) 4.5 B) 1 C) 5 D) 7 E) 8
answer
Answer: C) 5
question
43) Lead time for computers is 5 days with daily demand of 25 and safety stock of 5 computers. If management wants to use 10 kanbans how many computers should each one hold? A) 25 B) 1 C) 5 D) 10 E) 13
answer
Answer: E) 13
question
44) A grocery store is attempting to implement a kanban system. Which of the following would not be an application of kanbans? A) An empty doughnut tray signaling the bakery to produce 2 dozen glazed doughnuts. B) A line of 5 people in the Chinese department signaling the department to heat 5 Crab Rangoon. C) A red light on top of the cashier's lane signals that the cashier needs additional change replenished. D) The meat department stocking up on turkeys before Thanksgiving. E) All of the above are kanban applications.
answer
Answer: D) The meat department stocking up on turkeys before Thanksgiving.
question
45) Which of the following is FALSE regarding the links between JIT and quality? A) Inventory hides bad quality; JIT immediately exposes it. B) JIT reduces the number of potential sources of error by shrinking queues and lead times. C) As quality improves, fewer inventory buffers are needed; in turn, JIT performs better. D) If consistent quality exists, JIT allows firms to reduce all costs associated with inventory. E) JIT increases the cost of obtaining good quality.
answer
Answer: E) JIT increases the cost of obtaining good quality.
question
46) JIT makes quality cheaper because: A) the cost of low quality can be hidden as inventory cost. B) JIT adds more buffers to the system. C) JIT prevents long runs of defects. D) B and C E) A, B and C
answer
Answer: C) JIT prevents long runs of defects.
question
47) Great Lakes Barge and Baggage Company makes, among other things, battery-operated bilge pumps. Which of the following activities is NOT part of JIT? They: A) communicate their schedules to suppliers. B) produce in long production runs to reduce the impact of setup costs. C) use a pull system to move inventory. D) continuously work on reducing setup time. E) produce in small lots.
answer
Answer: B) produce in long production runs to reduce the impact of setup costs.
question
48) A manufacturer took the following actions to reduce inventory. Which of these is generally not accepted as a JIT action? A) It used a pull system to move inventory. B) It produced in ever smaller lots. C) It required deliveries directly to the point of use. D) It picked the supplier that offered the lowest price based on quantity discounts. E) It worked to reduce the company's in-transit inventory.
answer
Answer: D) It picked the supplier that offered the lowest price based on quantity discounts.
question
1) Employee empowerment is unnecessary in the Toyota Production System, because automation and powerful information systems reduce the need for employee creativity and decision making.
answer
Answer: FALSE
question
2) The Toyota Production System requires that activities have built-in, automatic tests to signal problems.
answer
Answer: TRUE
question
3) Which of the following is an illustration of employee empowerment? A) UPS drivers are trained to perform several motions smoothly and efficiently. B) Unionization of the work place brings better morale and therefore better quality. C) "No one knows the job better than those who do it." D) all of the above E) none of the above
answer
Answer: C) "No one knows the job better than those who do it."
question
4) Which of the following is not characteristic of a TPS employee? A) knowledgeable B) strict job classifications C) know more about their job than anyone else D) empowered E) All of the above characterize a TPS employee.
answer
Answer: B) strict job classifications
question
1) Which of the following is NOT an attribute of lean operations? A) eliminating almost all inventory through just-in-time techniques B) minimizing space requirements by reducing the distance a part travels C) pushing responsibility to the highest level possible through centralized decision making D) educating suppliers to accept responsibility for helping meet customer needs E) building worker flexibility through cross-training and reducing job classifications
answer
Answer: C) pushing responsibility to the highest level possible through centralized decision making
question
2) Lean operations are known for their: A) employee development. B) supplier education. C) supplier partnerships. D) challenging jobs. E) All of the above are attributes of lean operations.
answer
Answer: E) All of the above are attributes of lean operations.
question
3) Which of the following is characteristic of lean operations? A) inventory buffers between each workstation to minimize system downtime B) easy, mindless jobs C) specialty workers with no cross-training D) low space requirements E) no supplier partnerships
answer
Answer: D) low space requirements
question
1) Because most services cannot be inventoried, there is little place for JIT to help service organizations achieve competitive advantage.
answer
Answer: FALSE
question
2) Excess bags of basic commodities such as flour and sugar that are stored in a restaurant's kitchen represent which of the following wastes? A) overproduction B) queues C) transportation D) inventory E) defective product
answer
Answer: D) inventory