question
Which Risk Management principle is best demonstrated by through hazard identification and assessment in order to prevent needlessly jeopardizing Marines and equipment?
answer
Accept no unnecessary risk.
question
The statement, "You are more likely to control risks when they are identified earlier rather than later" is associated with what Risk Management principle?
answer
Anticipate and manage risk by planning
question
LCpl Jones wants to drive to his hometown for liberty in his private motor vehicle (PMV). LCpl Jones determines that his PMV has worn tires, a winter storm is forecasted when he plans to drive, and he has duty the night before he leaves. Using the 5-step Risk Management Process, when should the LCpl do next to mitigate the risk?
answer
Assess and prioritize the hazards.
question
Which of the following is an example of the second step, assess hazards, in the 5-step Risk Management Process.
answer
Determining the greatest hazard to you relates with swimming at a new beach.
question
The time critical level of Risk Management applies when on-the-run decisions are needed at the beginning of or during the execution of a task or mission.
answer
time critical
question
In-depth and - levels of Risk Management are used when there is time to document the results of the planning.
answer
deliberate
question
In correct order, What Are the Steps in the ABCD Model?
answer
Assess, balance, communicate with others, and do and debrief the event.
question
Choose an example of a physical control.
answer
Wearing an approved Department of Transportation (DOT) helmet while riding a motorcycle.
question
First Sergeant Jones posts a sign outside the entrance to the maintenance shop indicating that hearing protection is required inside. This is an example of what type of risk control?
answer
Administrative
question
Which element is often present when human error exists in a mishap?
answer
Pressure to complete the mission.
question
to get to a remote village, you have to cross a wooden bridge that spans a deep chasm. concerned about the structural integrity of the bridge you halt and request aviation support through your chain-of-command to cross the gap. halting before crossing and requesting aviation support to cross the gap reflects which risk management principle?
answer
Accept no unnecessary risk.
question
Elevating the risk decision up the chain-of-command is part of when Risk Management principle?
answer
Make risk decisions at the right level.
question
Which of the following is an example of the second step, assess hazards, in the 5-step Risk Management Process.
answer
Determining the greatest hazard to you related with swimming at a new beach.
question
Select the activity listed below which is best associated with implementing the in-depth level of Risk Management.
answer
Developing new training curricula.
question
Your unit is on a security patrol during a stability operation. You come across a civilian female...Using the ABCD Model what would be the next step?
answer
Balance your resources
question
Choose an example of an engineering control.
answer
Designing and installing a ventilation system to reduce exposure to toxic fumes in a building.
question
Prioritize types of controls from most preferred too least preferred.
answer
Engineering , administrative, physical.
question
Identifying risks as early as possible is part of what Risk Management principle?
answer
Anticipate and manage risk by planning.
question
Taking a risk that will not contribute to the task or mission accomplishment or will needlessly jeopardize personnel or material goes against when Risk Management principle?
answer
Accept no unnecessary risk.
question
You are at the beach. Looking up, your see a sign that says, "Hazardous Marine Life. Swim at Your Own Risk." ...Based on Risk Management principles and using the Risk Management process, how would you approach the idea of going for a swim now?
answer
Evaluate the situation to determine if the wire fence physical control will have the desire effect of mitigating the hazard to an acceptable level.
question
Designing a quiet generator to reduce the amount of hazardous noise is an example of what type of risk control?
answer
Engineering
question
A(n) _______ is defined as any real or potential condition that can cause injury, illness, or death to personnel; damage to or loss of equipment or property; degradation of mission capability or impact to mission accomplishment; or damage to the environment.
answer
hazard
question
A battalion commander and here staff are conducting a Marine Corps Planning Process (MCPP) session to develop an operations order (OPORD) for an upcoming offensive operation. The operation begins in 96-hours. The MCPP session would fall under with Risk Management level?
answer
Deliberate
question
During the deliberate planning for an offensive operation, you observe that ht emission re3quires crossing a wide river with a swift current...This support request is an example of which type f risk control option?
answer
Compensate for the risk.
question
What causes the majority of all mishaps?
answer
Human error
question
If decisions need to be made in less than 60 seconds, what Risk Management tool should be used?
answer
ABCD Model
question
Weighing risks against benefits and value is an example of applying which of the following Risk Management principles?
answer
Accept risk when benefits outweigh the cost.
question
Pvt Thompson is directed to move a 24-foot metal extension ladder from the supply room to the barracks for a work detail the next day...Which type of control option did Pvt Thompson use to mitigate the risk of the Thunderstorm?
answer
Delay an action.
question
Which of the following depicts the 5-step Risk Management Process in the correct order?
answer
Identify, assess, make decisions, implement controls, supervise.
question
_________is best used when you have limited time and resources to develop a risk assessment, make decisions, and act.
answer
Time Critical Risk Management (TCRM)
question
According to the Make Risk Decision step of the 5-step Risk Management process, after you identify and assess control options, you next determine the__________.
answer
type of control
question
Select from the choices below the activity which is the best example of the deliberates level of Risk Management.
answer
Operations planning.